郑州清华园1号住宅楼施工组织设计目 录一、 编制依据············································1二、 工程概况············································2三、 施工部署············································4(一)施工组织··········································4(二)任务划分··········································6(三)施工部署原则、施工顺序····························7(四)工程目标···········································8(五)施工总计划·········································8四、 施工准备···········································12(一)技术准备··········································12(二)生产准备··········································13(三)其他准备··········································15五、 主要施工方法及技术措施·····························15(一)流水段划分········································15(二)大型机械选用······································16(三)施工特点··········································16(四)施工流程及重点决策································16(五)测量放线·········································20(六)土方开挖与回填····································21(七)钎探、验槽······································22(八)...