交投昭通学院附中建设项目钢筋工程施工方案中国建筑第二工程局有限公司交投昭通学院附中项目部2017年3月8日目录一、编制依据.....................................................4二、工程概况.....................................................52.1工程概况.................................................52.2结构形式.................................................62.3钢筋接头概况.............................................6三、施工准备.....................................................73.1技术准备:...............................................73.2机具准备:...............................................73.3人员准备.................................................83.4物资准备:...............................................83.5钢筋作业条件准备........................................11四、主要施工方法及措施..........................................124.1整体施工工艺流程........................................124.2钢筋的锚固和接头........................................124.3钢筋制作加工............................................164.3.1钢筋制作..........................................164.3.2钢筋加工..........................................174.3.3定距框的制作......................................214.3.4钢筋直螺纹连接....................................224.4钢筋绑扎................................................254.4.1基础底板钢筋绑扎..................................254.4.2柱子钢筋绑扎......................................274.4.3梁钢筋绑扎........................................294.4.4板钢筋绑扎........................................304.4.5楼梯钢筋绑扎......................................314.4.6剪力墙钢筋绑扎....................................324.4.7钢筋保护层及技术措施..............................334.4.8本工程钢筋细部节点通用做法大样....................384.5成品钢筋码放............................................454.6场内钢筋运输............................................464.7钢筋制作要求............................................474.8测量放线控制............................................474.8.1剪力墙及暗柱定位控制..............................484.8.2框架柱钢筋的控制..................................484.8.3梁钢筋支撑........................................494.8.4楼板钢筋的控制....................................504.8.5严把成品保护关....................................514.8.6与其它工种的配合..................................51五、钢筋原材质量控制............................................515.1混凝土结构工程用钢筋(钢丝)的检验应符合的要求...........525.2钢筋原材证书及检验......................................525.3钢筋代换应符合下列要求:................................525.4钢筋出厂合格证和试验报告要求............................535.5钢筋的质量要求..........................................53六、钢筋加工质量验收标准........................................54七、钢筋绑扎及预埋件质量验收标准................................55八、直螺纹连接质量验收..........................................56九、一般质量缺陷处理办法........................................57十、安全文明施工措施............................................58十一、环保措施..................................................59一、编制依据序号类别名称编号1建筑工程施工质量验收统一标准GB50300-20132国家标准低碳钢热轧圆盘标准GB/T701-20083混凝土结构施工质量验收规范GB50204-20154钢筋混凝土用热轧带肋钢筋标准GBJ1499-20105混...