目录一、工程概况.......................................3二、编制依据.......................................4三、施工组织与部署..............................53.1施工组织.......................................53.2项目机构和职能..............................53.3施工部署.......................................63.4施工部署内容.................................73.5施工工期控制部署...........................8四、钢结构制作方案.............................104.1材料要求......................................104.2钢构件的制作................................114.3焊接H型钢的制作工艺.....................124.4钢构件的堆放及运输.......................18五、钢结构安装方案.............................205.1安装计划部署..............................205.3吊装设备的选择.............................215.3吊装设备的选择及验算..................215.4施工准备......................................225.5钢屋架的安装与校正.......................235.6维护系统的安装.............................235.7安装注意事项................................24六、高强螺栓连接工艺..........................251、高强螺栓的运输保管.....................252、高强螺栓安装..............................253、高强螺栓连接质量控制..................26七、涂装工艺......................................281、防腐涂料的涂装...........................282、涂装工艺....................................293、注意事项....................................304、涂装验收:.................................31八、质量保证措施................................318.1质量目标......................................318.2质量保证体系................................318.3质量管理流程................................338.4质量技术保证措施..........................368.5施工现场质量保证措施....................368.6施工质量注意事项..........................378.7测量质量控制................................38九、施工进度计划及保证措施.................399.1工期目标......................................399.2施工进度计划................................399.3施工进度计划保证措施....................399.4技术保证措施................................41十、安全保证措施................................4310.1安全施工目标..............................4310.2安全生产总则和部署.....................4310.3安全管理体系..............................4310.4安全生产管理一般措施..................4410.5钢结构制作安全措施.....................4510.6钢结构吊装安全措施.....................46十一、劳动力安排及措施.......................4811.1劳动力的组织保证措施..................4811.2劳动力的使用与安排.....................48十二、主要机具使用计划.......................5012.1机具...........................................5012.2机具...........................................5112.3主要测量工具..............................52一、工程概况长沙鑫航机轮刹车有限公司生产研制基地建设项目一期厂房一钢结构工程,位于长沙市雷高路与岳麓大道交汇处。本工程是单层门式钢结构厂房,高12.7米,建筑物总长96米,跨度为21×3米,建筑总面积为6048m2。本工程结构形式为:轻钢门式钢架;吊车型号QD型,起重量5T。主要构件结构截面形式:钢梁和钢柱均为焊接H型钢,基础采用钢筋砼独立基础,砌体结构部分为条形基础;柱脚采用外露式刚接柱脚。梁、柱及檩条间设置拉杆。柱梁的连接采用10.9级高强度螺栓,檩条连接采用普通C级螺栓,屋面采用檩条保温棉镀铝锌单层屋面,天沟材质为不锈钢,屋面采光带采用1.2mm厚双层采光透明板。柱脚锚栓材质为Q235B,吊车梁材质为Q345B,门式钢...