目录一、编制说明........................................................11.1编制依据....................................................11.2编制人员信息.................................................2二、工程及设备概况.................................................32.1工程概况.....................................................32.2龙门吊的选用.................................................42.3设备概况.....................................................4三、施工组织及管理..................................................63.1施工组织机构.................................................63.2工期计划.....................................................73.3设备及机具配置...............................................7四、安装单位资质、作业人员名单及证件................................94.1安装作业人员配置.............................................94.2安装单位资质................................................104.3安装单位作业人员证件........................................104.4汽车吊及人员证件............................................10五、轨道安装.......................................................11六、吊装前准备工作.................................................12七、吊装拆卸工艺流程..............................................137.1各主要部件吊装吊点..........................................137.2吊装作业顺序................................................147.3门吊拆卸工艺流程............................................247.4轨道检查...................................................277.5地锚与风绳设置.............................................28八、吊装设备选型...................................................338.1吊车选型及附图.............................................338.2各部件吊用钢丝绳及卸扣选型.................................348.3吊车的选型计算.............................................378.4门式起重机吊装过程中地基承载力检算.........................37九、施工安全保证措施...............................................409.1组织保障...................................................409.2安全保证措施...............................................409.3施工现场安全用电措施.......................................419.4主要风险点表...............................................439.5设备进场验收...............................................459.6门式起重机安装的安全注意事项...............................459.7现场作业安全要求...........................................459.8应急救援预案...............................................469.9各类事故的应急救援措施.....................................499.10信息报告程序..............................................54附表1:安装单位资质...............................................56附表2:作业人员操作证.............................................58附表3:汽车吊及操作人员证件.......................................60附表4:龙门吊基础计算书...........................................66一、编制说明1.1编制依据1、xx公司下发的《xx市城市轨道交通2号线一期工程<安全环保质量手册(暂行)>》(2014年11月)。2、起重机制作依据《起重机设计规范》GB/T3811-2008。3、起重机安装依据《起重机械安全规程》GB6067.1-2010。4、《通用门式起重机》GB/T14406-20115、《特种设备安全监察条例》。6、《建筑起重机械安全监督管理规定》建设部令166号。7、《关于进一步加强建筑起重机械安全管理的紧急通知》广州市住房和建设局。8、《关于规范建筑起重机械法定检验工作...