(1)目录第一章编制说明························································2第二章工程概况························································3第三章施工组织机构··················································3第四章施工部署························································4第五章施工协调管理··················································8第六章项目总承包管理和施工现场管理制度····················10第七章主要工程项目施工方法······································12第八章质量保证措施··················································25第九章质量通病及防止措施·········································28第十章安全保证措施··················································39第十一章文明施工、消防及环保措施·····························41附表一拟投入本项目的主要施工设备表··························45附表二拟配备本项目的试验和检测仪器设备表···············46附表三劳动力计划表··················································47附表四计划开、竣工日期和施工进度横道图····················48附表五施工总平面图··················································49附表六临时用地表·····················································50(1)(2)第一章、编制说明第一节、编制依据1、根据华夏银行包头分行新办公楼装修工程施工图;2、根据有关本次招标答疑纪要;3、国家现行施工验收规范和操作规程及国家质量评定标准;4、工程配合交叉施工的要求;5、有关文明工地标准要求;6、类似项目的参考经验;第二节、编制原则1、认真贯彻国家和地方有关本建设的各项方针、政策,遵守国家和地方的法律,严格执行施工程序和合同规定的工程竣工工期。2、实行施工、设计和建设单位三结合,做好施工部署。3、采用流水施工方法和进度计划技术组织有节奏、均衡和连续施工。4、坚持“百年大计,质量第一”,在安全生产的原则下,推行ISO9001标准化管理和实行安全生产责任制。5、做好人力物力的综合平衡调配,做好雨季施工安排,力争均衡生产。6、贯彻“勤俭节约”的方针,合理布置好施工现场,组织好文明施工。7、充分利用现有机械设备,扩大机械化施工范围,减轻劳动强度,提高劳动生产率;使用计算机辅助工程项目实现质量、工期和造价的控制。8、积极利用国内外新技术、新工艺、新材料,科学地确定施工方案。第三节、使用标准(1)《建筑工程施工质量验收统一标准》(GB50300-2002)(2)《建筑装饰装修工程质量验收规范》(GB50210-2002)(3)《建筑施工安全检查标准》(JGJ59-99)(4)《建筑内部装修设计防火规范》(GB50222-95)(5)民用建筑工程室内外环境污染控制规范(GB50325-200.1)(6)《室内装饰装修材料溶剂木器涂料中有害物质限量》GB18581(7)《室内装饰装修材料内墙涂料中有害物质限量》GB18582(8)《室内装饰装修材料胶粘剂中有害物质限量》GB18583(9)《室内装饰装修材料木家具中有害物质限量》GB18584(10)《室内装饰装修材料壁纸中有害物质限量》GB18585(11)《银行营业场所安全防范要求》GA38-2015(12)《银行业...