目录第一章工程概况············································3一、设计依据二、工程概况第二章施工方案和技术措施·································4-16一、测量放样二、给水施工(一)、管道沟槽开挖施工方法(二)、安装与敷设(三)、井室结构施工(四)、质量要求(五)、沟槽回填施工方法第三章质量保证措施和创优计划······························16-19一、确定质量控制目标二、建立严密质量保证体系三、建立可靠的质量管理措施四、确保工程质量的技术组织措施第四章施工总进度计划及保障措施································19-20一、施工进度计划表二、用工计划表三、主要施工机械设备表四、主要测量、质检仪器设备表第五章施工安全保证措施·······································20-25一、安全保证体系二、安全应急措施三、通疏导及施工围蔽第六章文明施工措施计划···········································26-27一、文明施工目标二、场容场貌管理措施三、文明建设措施第七章施工场地治安保卫管理计划···································27一、环境管理与保护二、环境保护措施第八章施工环保措施计划·······························28一、施工围挡与交通疏导第九章建筑废弃混凝土处置和再生建材利用措施计划·················29-30第十章特殊条件下施工方案································30第十一章施工现场总平面布置····························31第十二章项目组织管理机构··························32-26第十三章成品保护和工程保修工作的管理措施和承诺··············37-38第十四章任何可能紧急情况下的处理措置、预案以及抵抗风险················38-39第十五章与各标段道路总承包单位的配合、协调、管理服务方案·······39第十六章与发包人、项目管理单位、监理及设计人的配合···········39第十七章招标文件规定的其他内容·····················39第一章工程概况一、设计依据及标准、规范1、业主的设计委托书和双方签署的设计合同;2、业主提供的地形图;3、《城市工程管线综合规划规范》(GB50289-98);4、《室外给水设计规范》(GB50013-2006);5、《给水给水管道工程施工及验收规范》(GB50268-2008);6、《给水给水构筑物施工及验收规范》(GBJ141-90);7、国家现行有关标准、规范和法规;8、招标文件规定的要求;二、工程概况1)工程情况:临港新城新四平公路(两港西大道-江山路)给水管排管工程2)、计划工期:45日历天;3)、质量标准:一次验收合格率100%。4)、施工内容:(1)土石方施工(2)球墨铸铁管、HDPE给水管道施工(3)拆除及恢复施工(4)DN500球墨铸铁管606米,DN300球墨铸铁管173米、DN150球墨铸铁管25米,DN500焊接钢管25米,DN500HDP拖拉管117米,包含绿化修复、道路修复第二章施工方案和技术措施管道工程施工测量1、管道工程测量的准备工作。(1)熟悉设计图纸资料,清楚管线布置、工艺设计和施工安装要求。(2)熟悉现场情况,了解设计管线走向,以及管线沿途已有平面和高程控制点分布情况。(3)根据管道平面图和已有控制点,并结合实际地形,作好实测数据的计算整理,并绘制测量图。2、管道中线定位及高程控制测量。管道的起点、终点及转折点为管道的主点,其位置在施工图中确定,管线中线定位作法为将主点位置测设到地面上去,并用木桩标定。(1)管道中线定位管线走向与抗滑桩、支墩中心线平行。这时管线是在现场直接选定或在大比例尺地形图上设计时,根据地物的关系来确定主点的位置,于此按照设计提供的关系数据,进行管线定...