苏州市中环快速路工程高新区段(312国道~玉山路南)五标段前期策划中铁十局五公司二0一二年六月十二日1目录1.策划人员组成和编制依据..................................51.1策划人员组成......................................51.2策划依据..........................................52.工程概况................................................52.1工程概述..........................................52.2施工范围及内容....................................62.3工程造价..........................................82.4合同工期..........................................92.5主要技术标准......................................92.6自然条件.........................................102.7施工条件.........................................113.项目管理...............................................123.1外协管理.........................................123.2合同管理.........................................133.3推行架子队作业管理模式...........................134.项目经理部机构设置.....................................154.1机构设置.........................................164.2人员编制.........................................165.项目主要管理目标.......................................165.1安全管理目标.....................................165.2质量管理目标.....................................1925.3总工期及主要节点工期目标.........................215.4成本目标.........................................216.施工组织部署...........................................226.1临时工程方案.....................................226.2施工顺序及计划安排...............................297.主要技术方案...........................................467.1主要工程项目技术方案.............................467.2主要施工方法.....................................498.内部资源配置...........................................498.1物资人员.........................................498.2设备管理及维修人员...............................498.3机械设备配置.....................................499.施工机械设备使用进场方案和物资材料采购方案............529.1材料供应方案.....................................529.2调查分析.........................................549.3主要材料数量表...................................559.4材料、机械设备调查统计...........................5510.项目变更索赔方案......................................8310.1变更............................................8310.2索赔............................................8410.3变更索赔程序....................................8611.风险预控方案..........................................87311.1法律风险预控方案................................8711.2工程项目财务风险预控............................9011.3安全风险预控方案...............................9112.环保方案、现场文明施工及企业形象宣传..................9112.1环境保护........................................9112.2文明施工........................................9412.3项目部驻地宣传方案..............................9513.技术及工艺创新方案...................................10614.项目人才培养规划.....................................10714.1培养原则.......................................10714.2培养方式和内容.................................10714.3培养目标.......................................10815.分包方案.............................................1084苏州中环快速路五标段前期策划1.策划人员组成和编制依据1.1策划人员组成本次项目前期策划由公司总工李向阳任组长,工程技术部、企发部、人...