西充县芝麻沟还房小区景观工程施工组织设计编制单位:西充玉宇建筑工程有限责任公司编制日期:2017年3月目录第一章工程概况···························································4第二章编制依据···························································4第三章施工组织措施及组织机构人员配备·····························6第四章施工现场平面布置··············································6第五章劳动力安排计划·················································9第六章施工机具配置···················································10第七章材料、苗木供应计划···········································11第八章施工进度计划及工期保证措施································13第九章主要施工方案和技术措施·····································15第1节景观工程···········································15第2节绿化工程···········································33第3节水电安装工程·····································45第4节园区道路工程·····································53第十章关键工序及复杂环节相应的技术措施························57第1节雨季施工技术措施·······························57第2节大型乔木的运输保护措施·······················58第3节大树移植保成活技术措施·······················59第十一章质量控制措施···············································59第十二章安全生产、文明施工、环境保护措施·······················62第1节安全生产施工措施·······························62第2节文明、环保施工措施····························65第十三章施工组织设计附表········································68附表一:拟投入的主要施工机械设备表附表二:拟配备本标段的试验和检验仪器设备表附表三:劳动力计划表附表四:计划开、竣工日期和施工进度横道图第一章工程概况工程名称:西充县芝麻沟还房小区景观工程工程地点:西充县多扶镇工程内容:(1)土石方挖填、沥青道路、景观道路(含商业街道路)、铺装、花池、围墙、排水沟、小区配套单体工程(含小区岗亭、景观造型墙体等建构筑物)、停车位、景观廊架、非机动车停车棚、中心水景等施工内容;(2)乔木、灌木、草花、地被植物等软景绿化植物的选型、采购、运输、栽植、支撑、浇水、整形、清理、养护、成活、挖坑、覆土、保墒、种植土回填及造坡(含局部场地土石方挖填)等施工内容;第二章编制依据本施工组织设计作为主导施工的依据,编制时对目标工期、工程质量、项目管理机构人员配备、劳动力组织、施工进度计划控制、机械设备及材料供应计划、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性。本施工组织设计编制依据:1、西充县芝麻沟还房小区景观工程招标文件。2、西充县芝麻沟还房小区景观工程设计施工图纸。3、《城市绿化和园林绿地用植物材料木本苗》CJ...