脚手架工程设计与施工专项方案编制指南(落地式)工程名称:文件编号:CSCEC5-FAZN-16(项目自拟编号)发布日期:执行日期:插入项目效果图[工程名称]落地式脚手架工程设计与施工专项方案目录一、编制说明································································································11.1编制依据······························································································11.2编制人员······························································································11.3发放范围······························································································1二、工程概况································································································22.1工程概况······························································································22.2施工平面布置······················································································22.3施工要求和技术保证条件··································································3三、施工计划································································································43.1施工进度计划······················································································43.2材料与设备计划··················································································4四、施工管理及作业人员配备和分工···························································64.1施工管理人员······················································································64.2专职安全管理人员··············································································64.3特种作业人员······················································································64.4其他作业人员······················································································6五、施工工艺技术·························································...