摘要本施工组织设计是根据徐州花园小区合同约定的有关工期、质量、安全、文明施工等方面的要求,结据徐州花园小区工程实际情况,经过对工程设计图纸和文件的反复理解、熟悉、分析和计算而编制而成,作为据徐州花园小区工程施工指导性文件。本施工组织设计的主要内容有:工程概况、施工部署、土建工程主要施工技术、施工进度保证措施、施工质量保证措施、施工安全,现场消防和保卫制度、文明施工和环境保护制度、总分包管理等。施工过程中 框架柱钢筋采用电渣焊施工工艺、信息化测量技术、预拌技术、钢筋连接技术、新型建筑防水和塑料管应用技术、计算机应用和管理技术等八项新技术,确保优良工程,争创徐州市优质样板工程。关键词:住宅楼工程、设计分析、新技术Abstract: The construction organization design is based on the requirements of the construction period, quality, safety and civilized construction as stipulated in the Xuzhou Garden Community Contract. According to the actual situation of the Xuzhou Garden Community Project, after repeated understanding, familiarity, analysis and engineering design drawings and documents. Compiled and compiled as a guiding document for the construction of the Xuzhou Garden Community Project. The main contents of this construction organization design are: project overview, construction and deployment, main construction technology of civil engineering, construction progress guarantee measures, construction quality assurance measures, construction safety, on-site fire protection and security system, civilized construction and environmental protection system, and general subcontracting. Management, etc. During the construction process, the frame column steel bars adopt eight new technologies, such as electroslag welding construction technology, information measurement technology, premixing technology, steel bar connection technology, new building waterproofing and plastic pipe application technology, computer application and manage...