XXXXXXXXXXXXXXXXXXXXX 工程开挖穿越 XXX 沟渠施工方案编制人:审核人:审批人:编制单位:XXXXXXXXXXXXXXX 10 月 22 日目 录一、概述..............................................................................................................1二、施工所根据的重要原则、规范及有关图纸..............................................1三、施工方案......................................................................................................2四、工期计划......................................................................................................5五、施工组织......................................................................................................5六、施工用重要设备、机械及方法用料..........................................................6七、 HSE 和质量管理控制方法........................................................................7八、施工现场平面布置示意图..........................................................................8XXXXXXXXXXXXXXXXXXXXX 工程开挖穿越 XXX 沟渠施工方案一、概述XXXXXXXXXXXXXXXXXXXXX 工程纵二段需穿越位于 XX003 与 XX004 号桩之间的XXX 沟渠水渠一条。XXX 沟渠水渠两边地形平坦,XXX 沟渠水渠水面与渠堤之间的相对高差为 3.5m。渠床及岸坡稳定,两岸之间的宽度为 24m,水面宽 12m,渠中心的水深 3m(淤泥 5m)。穿越段管线规格型号 L360 ФXX×9.5 三层 PE 加强级防腐,渠的南岸自然标高为65.66,渠的南岸自然标高为 64.88,为确保管道管顶覆土不不大于 1.5 m,故本次穿越开挖深度为 7m~2m,土方开挖工作量大,加之 XXX 沟渠内有流水,通过现场实际查看我们拟采用打桩(或筑坝)围堰导流、排水清淤开挖的穿越方方式穿越 XXX 沟渠。为确保穿越工作的顺利竣工,结合现场状况特编制本方案,方便指导施工和作为结算根据。二、施工所根据的重要原则、规范及有关图纸1. 《油气长输管道工程施工及验收规范》(GB50369-)2. 《石油天然气建设工程施工质量验收规范 管道穿跨越工程》(SY4207-)3. 《石油天然气金属管道焊接工艺评定》(SY/T0452-)4. 《钢质管道焊接及验收》(SY/T4103-)5. 《石油天然气管道穿越工程施工及验收规范》SY/T4079-)6. 《埋地钢质管道聚...